7/21/2023 0 Comments Instal the new League of HeroesTurf installation for the obstacle course is complete except for the white lettering, which is expected to be complete by the week of the May 23. Trash receptacles, bike racks, and solar light bollards have also been installed throughout the trail. Remainder of concrete curb and decomposed granite placement was completed on May 2. The Fitness/Obstacle Course will be southeast of the Recreation Center near the park boundary and accessed easily from the eastern parking lot. The Dog Park will be constructed adjacent to but outside of the trail within the undeveloped section of the park. The trail will consist of a 10-foot-wide decomposed granite trail bounded by two concrete curbs to stabilize the trail surface material and lower maintenance costs. ![]() The 5K Loop, approved and funded in 2017 by the 4B Corporation, will completely encircle the existing park with an additional loop taking in an undeveloped portion of the park to the east of the current recreational facilities and the eastern-most parking lot. The three planned improvements to League City’s Hometown Heroes Park-the 5K Loop Trail, the East Side Dog Park, and the Fitness/Obstacle Course-were combined into one project in January 2020, as TBG’s design contract was amended to include the Fitness Course and some alternate items for the Dog Park. ![]() $1.7 million Subdivisions, Areas, or Streets Impacted
0 Comments
Leave a Reply. |